Daytime Noise Monitoring Results -- Normal weekday
Station M5, Chuk Lam Ming Tong
                 
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
03-Jul-13 11:08 11:38 Sunny 62.8 64.8 58.3 Operatorion of excavator and welding Road traffic noise and rock excavation in Sandy Bay Sewage Screening Plant by other contractor  N.A 29.7 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 3003246
08-Jul-13 13:22 13:52 Sunny 72.7 75.4 62.7 Tunnel works Road traffic noise and rock excavation in Sandy Bay Sewage Screening Plant by other contractor  N.A 28.8 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 3003246
18-Jul-13 13:26 13:56 Sunny 64.0 65.7 60.3 Tunnel works Road traffic noise  N.A 27.3 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 3003246
30-Jul-13 11:25 11:55 Sunny 62.7 64.1 59.5 Tunnel works Road traffic noise  N.A 29.1 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 3004068
Min. 62.7
Max. 72.7